Shopfront and shutter packages in Tilbury
Shopfronts and Shutters UK plans, supplies and fits shopfront and shutter packages in Tilbury, starting with a free site survey. Guide prices start from £3,895 plus VAT.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

How does it work in Tilbury?
We cover Tilbury and postcodes including RM18, and teams working here can also reach Grays and Stanford-le-Hope. Parking, deliveries and pavement space all go into the plan for fitting day.
What should you check before you decide?
Is the box accessible for servicing?
It has to be. We build in a removable panel so that an engineer can reach the motor, brake and spring parts.
How does a joint install save trading time?
The frontage and shutter go in as one sequence, so you close once. With two contractors, you close twice and hope they agree on who damaged what.
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
What are the guide prices?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent in Tilbury?
An external shutter normally needs planning permission from Thurrock Council. An internal shutter or grille often does not, so it is worth checking before you order. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Tilbury?
Can you fit a package around my trading hours in Tilbury?
Yes. Closed-day or out-of-hours fitting can be arranged.
How much is a shopfront and shutter package in Tilbury?
For a unit up to 3 m wide, guide prices start from £3,895 plus VAT. The written quotation after a free site survey sets the final price.
How long does a package take in Tilbury?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Do I need planning permission for a package?
Often, yes. A changed frontage or an external shutter usually needs consent from your council. We can advise what to check at survey.
Where else do we fit shopfront and shutter packages near Tilbury?
What else can we do in Tilbury?
Find out what your frontage will cost in Tilbury
Answer four quick questions for a guide price, or book a free survey for a firm one.