Shopfront and shutter packages in Bexleyheath
We fit shopfront and shutter packages in Bexleyheath from £3,895 plus VAT. You get a free site survey, an itemised quotation and one contract for both parts.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

How does it work in Bexleyheath?
Whether the unit is on the main shopping street or a local parade in Bexleyheath, the job is measured the same way, and London Borough of Bexley is the council to check with.
What are the guide prices?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What makes the difference?
Who is responsible if something goes wrong?
One company. Your contract is with S&K Glazing Limited for both parts, so nobody can point at the other contractor.
Is the box accessible for servicing?
It has to be. We build in a removable panel so that an engineer can reach the motor, brake and spring parts.
How does a joint install save trading time?
The frontage and shutter go in as one sequence, so you close once. With two contractors, you close twice and hope they agree on who damaged what.
Will this need planning permission in Bexleyheath?
An external shutter normally needs planning permission from London Borough of Bexley. An internal shutter or grille often does not, so it is worth checking before you order. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Bexleyheath?
Can you fit a package around my trading hours in Bexleyheath?
Yes. Closed-day or out-of-hours fitting can be arranged.
Do you cover Bexleyheath for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Bexleyheath.
How long does a package take in Bexleyheath?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
How long will my shop be closed?
That depends on the job, and your quotation sets out the fitting days. We plan the work around trading hours and can arrange closed-day or out-of-hours fitting.
Where else do we fit shopfront and shutter packages near Bexleyheath?
What else can we do in Bexleyheath?
Find out what your frontage will cost in Bexleyheath
Answer four quick questions for a guide price, or book a free survey for a firm one.