Perforated roller shutters in March
Need a perforated roller shutter in March? We survey the opening, tell you what to check on consent, then make and fit it. Guide prices start at £1,750 plus VAT.
- Guide price, plus VAT
- £1,750 to £4,295
- Lead time
- 2 to 3 weeks after survey

What happens in March?
Local rules matter more than people expect. Fenland District Council handles planning for March, and its view of external shutters and frontage changes shapes what we recommend.
How much will it cost?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £1,750 to £2,295 |
| 3 to 4 m | A wider single unit | £2,195 to £2,895 |
| 4 to 5 m | A double-fronted or corner unit | £2,695 to £3,495 |
| 5 to 6 m | A large double unit | £3,195 to £4,295 |
Guide prices, not offers. Your written quotation sets the final figure.
What makes the difference?
How is the shutter controlled?
By key switch, remote or both, and we specify a manual override for power cuts. Keep the override instructions somewhere that staff can find them.
What about a fire exit?
A shutter must never trap people in. If it covers an escape route, it needs to be open while the premises are occupied, or opened easily from inside.
What will my insurer want?
Some insurers name a shutter type or rating, and many ask for locks and service records. Ask them before you order, as it saves a change later.
Will this need planning permission in March?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so Fenland District Council will normally expect a planning application. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about perforated roller shutters in March?
Do you cover the postcodes around March?
Yes, including PE15 and PE16.
Can you match the shutter to my shopfront?
Yes. We powder coat to a RAL colour to match your frame as closely as we can.
Do I need planning permission for a shutter in March?
An external shutter usually needs it, and Fenland District Council decides. Many councils resist solid external shutters, and some resist perforated ones too.
Are perforated shutters more likely to get planning permission?
Not reliably. Some councils accept them and others resist them, so check with your council before you order.
Where else do we fit perforated roller shutters near March?
What else can we do in March?
Find out what your frontage will cost in March
Answer four quick questions for a guide price, or book a free survey for a firm one.