Vision roller shutters in March
For vision roller shutters in March, guide prices start at £2,195 plus VAT, and every job begins with a free site survey.
- Guide price, plus VAT
- £2,195 to £5,195
- Lead time
- 2 to 3 weeks after survey

What can you expect in March?
Whether the unit is on the main shopping street or a local parade in March, the job is measured the same way, and Fenland District Council is the council to check with.
What are the guide prices?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £2,195 to £2,895 |
| 3 to 4 m | A wider single unit | £2,795 to £3,595 |
| 4 to 5 m | A double-fronted or corner unit | £3,395 to £4,395 |
| 5 to 6 m | A large double unit | £3,995 to £5,195 |
Guide prices, not offers. Your written quotation sets the final figure.
What makes the difference?
Can the shutter match my frontage?
Yes. Curtain, box and guides are powder coated to a RAL colour to match your frame as closely as the finish allows.
Steel or aluminium laths?
Steel is stronger and heavier. Aluminium is lighter and quieter, which helps under flats. Most shops are well served by either.
Does a shutter need planning permission?
An external shutter usually does. Many councils resist solid external shutters, and some resist perforated ones too. An internal grille or shutter is usually the safer route, so we can advise what to check before you order.
Will this need planning permission in March?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so Fenland District Council will normally expect a planning application. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about vision roller shutters in March?
Can you match the shutter to my shopfront?
Yes. We powder coat to a RAL colour to match your frame as closely as we can.
Do I need planning permission for a shutter in March?
An external shutter usually needs it, and Fenland District Council decides. Many councils resist solid external shutters, and some resist perforated ones too.
How soon can you fit a vision roller shutter in March?
Lead time is 2 to 3 weeks after survey. We agree the fitting day with you.
Are clear inserts worth having?
Usually, on exposed streets. They keep out litter and weather, but scratch over time.
Where else do we fit vision roller shutters near March?
What else can we do in March?
Find out what your frontage will cost in March
Answer four quick questions for a guide price, or book a free survey for a firm one.