Full frontage replacement across Gwent
If your shop in Gwent needs a new front and a shutter, we can do both as one job, from £3,895 plus VAT, with strip-out priced at survey, after a free site survey.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What happens across Gwent?
We work right across Gwent, including Newport, Cwmbran, Pontypool and Ebbw Vale. Rules on frontages and shutters differ from one council to the next. Councils here include Newport, Caerphilly and Blaenau Gwent. Newport and Cwmbran carry the larger units, with valleys towns such as Ebbw Vale and Tredegar and border towns such as Abergavenny and Monmouth.
What should you think about first?
Who is responsible if something goes wrong?
One company. Your contract is with S&K Glazing Limited for both parts, so nobody can point at the other contractor.
What happens to my old frontage?
If the job is a replacement, removal and disposal are priced on the quotation, and we aim to leave the unit secure or boarded overnight.
What does one drawing change?
Everything lines up: door head, guide channels, fascia, sign fixing and power supply. It also gives your council or landlord one clear document to look at.
How much will it cost?
| Work | Guide price plus VAT |
|---|---|
| A new frontage, with strip-out of the old one priced at survey | £3,895 to £15,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Will this need planning permission across Gwent?
Probably, if it is external. Your council decides. Many councils resist solid external shutters, and some resist perforated ones too. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent, and rules are set by the Welsh Government.
What do people ask about full frontage replacements across Gwent?
Can you fit a package around my trading hours across Gwent?
Yes. Closed-day or out-of-hours fitting can be arranged.
How long does a package take across Gwent?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Do you cover Gwent for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts across Gwent.
Will my shop be secure during the replacement?
We plan the sequence around that, and aim to leave the opening secure or boarded before anyone leaves site.