Steel shopfronts in Tyldesley
Need a steel shopfront in Tyldesley? We draw it from a free site survey, make it to your opening and fit it around your trading hours. Guide prices start at £3,600 plus VAT.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What can you expect in Tyldesley?
Our surveys in Tyldesley cover postcodes including M29, along with Atherton and Leigh. Planning applications here go to Wigan Metropolitan Borough Council, so it is worth reading any shopfront guidance it publishes before anything is drawn.
How much will it cost?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you check before you decide?
How do you deal with the threshold?
We aim for level or near-level access. New doors need thought about wheelchair and pushchair users, and we check the floor before we promise anything.
Can I keep trading during the work?
Often, in part. Fitting days can be planned for your quiet days, and closed-day or out-of-hours work can be arranged.
Which colours work best?
Dark greys and black are the most requested because they frame the shop well. In a conservation area, ask us first, as colour can matter to the council.
Will this need planning permission in Tyldesley?
A like-for-like replacement often does not need permission, but a visibly different frontage usually does. The application goes to Wigan Metropolitan Borough Council. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Tyldesley?
Does a new shopfront in Tyldesley need planning permission?
A change to how the frontage looks usually does. Wigan Metropolitan Borough Council is the council to check with, and we advise at survey.
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
Do you cover the postcodes around Tyldesley?
Yes, including M29.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Tyldesley?
What else can we do in Tyldesley?
Find out what your frontage will cost in Tyldesley
Answer four quick questions for a guide price, or book a free survey for a firm one.