Steel shopfronts across Tayside
We survey, make and fit steel shopfronts across Tayside, starting with a free site survey. Guide prices start from £3,600 plus VAT.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What happens across Tayside?
Our teams cover Dundee, Perth, Arbroath and Forfar and the rest of Tayside. If your shop is in a conservation area or a listed building, tell us at the start, because it changes the options. Dundee and Perth are the main centres, with Arbroath and Montrose on the coast and Forfar inland.
What should you budget?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you think about first?
How is the frontage measured?
We measure the structural opening, not the old frame. Lintel condition, floor level and how square the opening is all get recorded at survey.
What about the fascia and sign?
We set out the fascia at the same time, so your sign fixings and any shutter box do not clash. Illuminated signs can need advertisement consent, depending on size, position and area.
Should the stallriser stay?
A stallriser protects the bottom of the glass from kicks, trolleys and cleaning water. On older streets it is also part of the look.
Do you need consent across Tayside?
Usually yes, if the look of the frontage changes. Replacing like for like may not need permission, but your council has the final say. In Scotland, work can also need a building warrant before it starts, and listed buildings need listed building consent from the council.
What do people ask about steel shopfronts across Tayside?
Does a new shopfront across Tayside need planning permission?
A change to how the frontage looks usually does. Your council is the council to check with, and we advise at survey.
How soon can you fit a steel shopfront across Tayside?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
Does steel rust?
Not if the finish is right and stays intact. It is galvanised or primed, then powder coated.
Which towns do we cover in Tayside?
Find out what your frontage will cost across Tayside
Answer four quick questions for a guide price, or book a free survey for a firm one.