Steel shopfronts in Perth
We survey, make and fit steel shopfronts in Perth, starting with a free site survey. Guide prices start from £3,600 plus VAT.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What can you expect in Perth?
A frontage in Perth has to suit the street as well as the shop. Perth and Kinross Council decides what is acceptable where planning applies, so we draw with that in mind.
What should you budget?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What makes the difference?
What does the written quotation show?
Every item: frame, glass, doors, stallriser, strip-out and any electrics. It stays valid for 90 days, and nothing is ordered until you accept.
What affects the price most?
Width, the number of doors, glass type and any strip-out. A second door or a laminated upgrade moves the figure more than the colour does.
Should the stallriser stay?
A stallriser protects the bottom of the glass from kicks, trolleys and cleaning water. On older streets it is also part of the look.
Do you need consent in Perth?
Usually yes, if the look of the frontage changes. Replacing like for like may not need permission, but Perth and Kinross Council has the final say. In Scotland, work can also need a building warrant before it starts, and listed buildings need listed building consent from the council.
What do people ask about steel shopfronts in Perth?
Does a new shopfront in Perth need planning permission?
A change to how the frontage looks usually does. Perth and Kinross Council is the council to check with, and we advise at survey.
Do you cover the postcodes around Perth?
Yes, including PH2 and PH1.
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Perth?
What else can we do in Perth?
Find out what your frontage will cost in Perth
Answer four quick questions for a guide price, or book a free survey for a firm one.