Steel shopfronts in Stevenage
We survey, make and fit steel shopfronts in Stevenage, starting with a free site survey. Guide prices start from £3,600 plus VAT.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What happens in Stevenage?
We aim to fit the survey around your opening hours in Stevenage, and we also cover Hitchin and Letchworth Garden City. You get the same written quotation wherever the shop is.
What are the guide prices?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you check before you decide?
What about the fascia and sign?
We set out the fascia at the same time, so your sign fixings and any shutter box do not clash. Illuminated signs can need advertisement consent, depending on size, position and area.
Can I keep trading during the work?
Often, in part. Fitting days can be planned for your quiet days, and closed-day or out-of-hours work can be arranged.
What affects the price most?
Width, the number of doors, glass type and any strip-out. A second door or a laminated upgrade moves the figure more than the colour does.
Do you need consent in Stevenage?
Usually yes, if the look of the frontage changes. Replacing like for like may not need permission, but Stevenage Borough Council has the final say. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Stevenage?
Do you cover the postcodes around Stevenage?
Yes, including SG1, SG2 and SG3.
Does a new shopfront in Stevenage need planning permission?
A change to how the frontage looks usually does. Stevenage Borough Council is the council to check with, and we advise at survey.
How soon can you fit a steel shopfront in Stevenage?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Stevenage?
What else can we do in Stevenage?
Find out what your frontage will cost in Stevenage