Steel shopfronts in Hitchin
Steel shopfronts in Hitchin start from £3,600 plus VAT. Each is made to the measured opening, after a free site survey.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What can you expect in Hitchin?
Local rules matter more than people expect. North Hertfordshire District Council handles planning for Hitchin, and its view of external shutters and frontage changes shapes what we recommend.
What should you check before you decide?
What does the written quotation show?
Every item: frame, glass, doors, stallriser, strip-out and any electrics. It stays valid for 90 days, and nothing is ordered until you accept.
How do you deal with the threshold?
We aim for level or near-level access. New doors need thought about wheelchair and pushchair users, and we check the floor before we promise anything.
How is the frontage measured?
We measure the structural opening, not the old frame. Lintel condition, floor level and how square the opening is all get recorded at survey.
What are the guide prices?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Will this need planning permission in Hitchin?
A like-for-like replacement often does not need permission, but a visibly different frontage usually does. The application goes to North Hertfordshire District Council. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Hitchin?
How much does a steel shopfront cost in Hitchin?
Guide prices start from £3,600 plus VAT. Size, doors and glass set the final figure after a free site survey.
How soon can you fit a steel shopfront in Hitchin?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Hitchin?
What else can we do in Hitchin?
Find out what your frontage will cost in Hitchin
Answer four quick questions for a guide price, or book a free survey for a firm one.