Steel shopfronts in Mexborough
Our steel shopfronts in Mexborough come with a free site survey, an itemised written quotation and a guide price from £3,600 plus VAT.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

How does it work in Mexborough?
A frontage in Mexborough has to suit the street as well as the shop. City of Doncaster Council decides what is acceptable where planning applies, so we draw with that in mind.
What makes the difference?
Can I keep trading during the work?
Often, in part. Fitting days can be planned for your quiet days, and closed-day or out-of-hours work can be arranged.
What affects the price most?
Width, the number of doors, glass type and any strip-out. A second door or a laminated upgrade moves the figure more than the colour does.
Should the stallriser stay?
A stallriser protects the bottom of the glass from kicks, trolleys and cleaning water. On older streets it is also part of the look.
What should you budget?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent in Mexborough?
Usually yes, if the look of the frontage changes. Replacing like for like may not need permission, but City of Doncaster Council has the final say. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Mexborough?
How soon can you fit a steel shopfront in Mexborough?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
How much does a steel shopfront cost in Mexborough?
Guide prices start from £3,600 plus VAT. Size, doors and glass set the final figure after a free site survey.
Do you cover the postcodes around Mexborough?
Yes, including S64.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Mexborough?
What else can we do in Mexborough?
Find out what your frontage will cost in Mexborough
Answer four quick questions for a guide price, or book a free survey for a firm one.