Steel shopfronts in Maidstone
Our steel shopfronts in Maidstone come with a free site survey, an itemised written quotation and a guide price from £3,600 plus VAT.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What happens in Maidstone?
Working in Maidstone means working with Maidstone Borough Council on planning, and sometimes with a landlord on the lease. We flag both early, so that neither one holds up your opening date.
What should you check before you decide?
What about the fascia and sign?
We set out the fascia at the same time, so your sign fixings and any shutter box do not clash. Illuminated signs can need advertisement consent, depending on size, position and area.
What affects the price most?
Width, the number of doors, glass type and any strip-out. A second door or a laminated upgrade moves the figure more than the colour does.
How do you deal with the threshold?
We aim for level or near-level access. New doors need thought about wheelchair and pushchair users, and we check the floor before we promise anything.
What are the guide prices?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent in Maidstone?
It depends on how much changes. A new layout, new materials or a moved door usually needs permission from Maidstone Borough Council. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Maidstone?
Do you cover the postcodes around Maidstone?
Yes, including ME16, ME15 and ME14.
How soon can you fit a steel shopfront in Maidstone?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
Does a new shopfront in Maidstone need planning permission?
A change to how the frontage looks usually does. Maidstone Borough Council is the council to check with, and we advise at survey.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Maidstone?
What else can we do in Maidstone?
Find out what your frontage will cost in Maidstone
Answer four quick questions for a guide price, or book a free survey for a firm one.