Shopfront and shutter packages in Maidstone
We fit shopfront and shutter packages in Maidstone from £3,895 plus VAT. You get a free site survey, an itemised quotation and one contract for both parts.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

How does it work in Maidstone?
Local rules matter more than people expect. Maidstone Borough Council handles planning for Maidstone, and its view of external shutters and frontage changes shapes what we recommend.
What should you check before you decide?
Is the box accessible for servicing?
It has to be. We build in a removable panel so that an engineer can reach the motor, brake and spring parts.
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
What decides the final package price?
Width, height, frame material, curtain type, and whether the box can be hidden. Access and strip-out are the other two things that move the price.
What are the guide prices?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent in Maidstone?
Probably, if it is external. Maidstone Borough Council decides. Many councils resist solid external shutters, and some resist perforated ones too. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Maidstone?
How much is a shopfront and shutter package in Maidstone?
For a unit up to 3 m wide, guide prices start from £3,895 plus VAT. The written quotation after a free site survey sets the final price.
How long does a package take in Maidstone?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Do you cover Maidstone for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Maidstone.
How long will my shop be closed?
That depends on the job, and your quotation sets out the fitting days. We plan the work around trading hours and can arrange closed-day or out-of-hours fitting.
Where else do we fit shopfront and shutter packages near Maidstone?
What else can we do in Maidstone?
Find out what your frontage will cost in Maidstone
Answer four quick questions for a guide price, or book a free survey for a firm one.