Steel shopfronts in Bethnal Green
Steel shopfronts in Bethnal Green start from £3,600 plus VAT. Each is made to the measured opening, after a free site survey.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

How does it work in Bethnal Green?
Working in Bethnal Green means working with London Borough of Tower Hamlets on planning, and sometimes with a landlord on the lease. We flag both early, so that neither one holds up your opening date.
What makes the difference?
What affects the price most?
Width, the number of doors, glass type and any strip-out. A second door or a laminated upgrade moves the figure more than the colour does.
Can I keep trading during the work?
Often, in part. Fitting days can be planned for your quiet days, and closed-day or out-of-hours work can be arranged.
Which colours work best?
Dark greys and black are the most requested because they frame the shop well. In a conservation area, ask us first, as colour can matter to the council.
How much will it cost?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent in Bethnal Green?
Usually yes, if the look of the frontage changes. Replacing like for like may not need permission, but London Borough of Tower Hamlets has the final say. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Bethnal Green?
How soon can you fit a steel shopfront in Bethnal Green?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
Does a new shopfront in Bethnal Green need planning permission?
A change to how the frontage looks usually does. London Borough of Tower Hamlets is the council to check with, and we advise at survey.
Do you cover the postcodes around Bethnal Green?
Yes, including E2.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Bethnal Green?
What else can we do in Bethnal Green?
Find out what your frontage will cost in Bethnal Green
Answer four quick questions for a guide price, or book a free survey for a firm one.