Shopfronts and shutters in Bethnal Green
We fit shopfronts and matching shutters in Bethnal Green, as one job or separately, and carry out repairs and servicing on what you already have.

How do we work in Bethnal Green?
We cover postcodes including E2 here. For planning you will be dealing with London Borough of Tower Hamlets, and we also work in Shoreditch and Whitechapel.
What can we do in Bethnal Green?
| Service | Price plus VAT |
|---|---|
| Shopfront repairs | £165, first hour included |
| Steel shopfronts | From £3,600 |
| High-security shutters | From £3,995 |
| Vision roller shutters | From £2,195 |
| Electric roller shutters | From £1,450 |
| Shopfront and shutter packages | From £3,895 |
| Frameless glass shopfronts | From £4,995 |
| Shutter servicing | Fixed £145 |
| Insulated roller shutters | From £1,850 |
| Aluminium shopfronts | From £2,450 |
| Shutter repairs and servicing | Quoted after inspection |
| Perforated roller shutters | From £1,750 |
What should you think about first?
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
Is the box accessible for servicing?
It has to be. We build in a removable panel so that an engineer can reach the motor, brake and spring parts.
What should I do if a shutter or door fails?
Stop using it if it looks unsafe, keep people clear and take a photo. Do not force a stuck shutter, as the springs and barrel are under load.
Do you need consent in Bethnal Green?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so London Borough of Tower Hamlets will normally expect a planning application. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask?
Do you cover Bethnal Green?
Yes. We survey and fit here, and the survey for new work is free.
Which council handles planning in Bethnal Green?
London Borough of Tower Hamlets. We tell you at survey whether your work needs consent.
How long does a package take in Bethnal Green?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Who decides planning for a frontage in Bethnal Green?
London Borough of Tower Hamlets is the planning authority. We tell you at survey what is likely to need consent.
Which towns are nearby?
Find out what your frontage will cost in Bethnal Green
Answer four quick questions for a guide price, or book a free survey for a firm one.