Shopfront and shutter packages in Totton
Shopfronts and Shutters UK plans, supplies and fits shopfront and shutter packages in Totton, starting with a free site survey. Guide prices start from £3,895 plus VAT.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What happens in Totton?
We cover Totton and postcodes including SO40 and SO43, and teams working here can also reach Southampton and Portswood. Parking, deliveries and pavement space all go into the plan for fitting day.
How much will it cost?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What is worth knowing?
Is the box accessible for servicing?
It has to be. We build in a removable panel so that an engineer can reach the motor, brake and spring parts.
Why plan the frontage and shutter together?
Because the shutter box needs a home. Plan it with the fascia and it disappears. Add it later and it usually ends up on the face of the building.
What does one drawing change?
Everything lines up: door head, guide channels, fascia, sign fixing and power supply. It also gives your council or landlord one clear document to look at.
Will this need planning permission in Totton?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so New Forest District Council will normally expect a planning application. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Totton?
Do you cover Totton for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Totton.
How long does a package take in Totton?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Who decides planning for a frontage in Totton?
New Forest District Council is the planning authority. We tell you at survey what is likely to need consent.
How long will my shop be closed?
That depends on the job, and your quotation sets out the fitting days. We plan the work around trading hours and can arrange closed-day or out-of-hours fitting.
Where else do we fit shopfront and shutter packages near Totton?
What else can we do in Totton?
Find out what your frontage will cost in Totton
Answer four quick questions for a guide price, or book a free survey for a firm one.