Shopfront and shutter packages in Skipton
If your shop in Skipton needs a new front and a shutter, we can do both as one job, from £3,895 plus VAT, after a free site survey.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What can you expect in Skipton?
Skipton sits in North Yorkshire, and North Yorkshire Council is the planning authority. For most shops that means checking consent before the order is placed, not after it.
What should you budget?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you check before you decide?
What decides the final package price?
Width, height, frame material, curtain type, and whether the box can be hidden. Access and strip-out are the other two things that move the price.
What happens to my old frontage?
If the job is a replacement, removal and disposal are priced on the quotation, and we aim to leave the unit secure or boarded overnight.
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
Will this need planning permission in Skipton?
Probably, if it is external. North Yorkshire Council decides. Many councils resist solid external shutters, and some resist perforated ones too. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Skipton?
How much is a shopfront and shutter package in Skipton?
For a unit up to 3 m wide, guide prices start from £3,895 plus VAT. The written quotation after a free site survey sets the final price.
Who decides planning for a frontage in Skipton?
North Yorkshire Council is the planning authority. We tell you at survey what is likely to need consent.
How long does a package take in Skipton?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Can the shutter box be hidden?
Usually, yes. When the frontage is new we can build the box in behind the fascia and leave an access panel for servicing. Head height above the door decides how much room there is.
Where else do we fit shopfront and shutter packages near Skipton?
What else can we do in Skipton?
Find out what your frontage will cost in Skipton
Answer four quick questions for a guide price, or book a free survey for a firm one.