Shopfront and shutter packages in Colne
Shopfronts and Shutters UK plans, supplies and fits shopfront and shutter packages in Colne, starting with a free site survey. Guide prices start from £3,895 plus VAT.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What can you expect in Colne?
Working in Colne means working with Pendle Borough Council on planning, and sometimes with a landlord on the lease. We flag both early, so that neither one holds up your opening date.
What are the guide prices?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you think about first?
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
Why plan the frontage and shutter together?
Because the shutter box needs a home. Plan it with the fascia and it disappears. Add it later and it usually ends up on the face of the building.
Is the box accessible for servicing?
It has to be. We build in a removable panel so that an engineer can reach the motor, brake and spring parts.
Will this need planning permission in Colne?
Probably, if it is external. Pendle Borough Council decides. Many councils resist solid external shutters, and some resist perforated ones too. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Colne?
Who decides planning for a frontage in Colne?
Pendle Borough Council is the planning authority. We tell you at survey what is likely to need consent.
Can you fit a package around my trading hours in Colne?
Yes. Closed-day or out-of-hours fitting can be arranged.
How long does a package take in Colne?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Do I need planning permission for a package?
Often, yes. A changed frontage or an external shutter usually needs consent from your council. We can advise what to check at survey.
Where else do we fit shopfront and shutter packages near Colne?
What else can we do in Colne?
Find out what your frontage will cost in Colne
Answer four quick questions for a guide price, or book a free survey for a firm one.