Shopfront and shutter packages in Pinner
One drawing, one price and one fitting team: that is how we handle shopfront and shutter packages in Pinner. Guide prices start at £3,895 plus VAT.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What happens in Pinner?
Our surveys in Pinner cover postcodes including HA5 and HA6, along with Ruislip and Harrow. Planning applications here go to London Borough of Harrow, so it is worth reading any shopfront guidance it publishes before anything is drawn.
What are the guide prices?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you think about first?
What does one drawing change?
Everything lines up: door head, guide channels, fascia, sign fixing and power supply. It also gives your council or landlord one clear document to look at.
Who is responsible if something goes wrong?
One company. Your contract is with S&K Glazing Limited for both parts, so nobody can point at the other contractor.
How does a joint install save trading time?
The frontage and shutter go in as one sequence, so you close once. With two contractors, you close twice and hope they agree on who damaged what.
Will this need planning permission in Pinner?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so London Borough of Harrow will normally expect a planning application. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Pinner?
Do you cover Pinner for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Pinner.
Can you fit a package around my trading hours in Pinner?
Yes. Closed-day or out-of-hours fitting can be arranged.
How long does a package take in Pinner?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Is it cheaper to buy the shopfront and shutter together?
We price each part honestly and do not promise a discount. What you avoid is a second survey, a second visit, a second closure and a shutter box added after the event.
Where else do we fit shopfront and shutter packages near Pinner?
What else can we do in Pinner?
Find out what your frontage will cost in Pinner
Answer four quick questions for a guide price, or book a free survey for a firm one.