Shopfront and shutter packages in Greenford
If your shop in Greenford needs a new front and a shutter, we can do both as one job, from £3,895 plus VAT, after a free site survey.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What happens in Greenford?
We aim to fit the survey around your opening hours in Greenford, and we also cover Southall and Ealing. You get the same written quotation wherever the shop is.
What are the guide prices?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What is worth knowing?
How does a joint install save trading time?
The frontage and shutter go in as one sequence, so you close once. With two contractors, you close twice and hope they agree on who damaged what.
What happens to my old frontage?
If the job is a replacement, removal and disposal are priced on the quotation, and we aim to leave the unit secure or boarded overnight.
Why plan the frontage and shutter together?
Because the shutter box needs a home. Plan it with the fascia and it disappears. Add it later and it usually ends up on the face of the building.
Do you need consent in Greenford?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so London Borough of Ealing will normally expect a planning application. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Greenford?
Do you cover Greenford for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Greenford.
Can you fit a package around my trading hours in Greenford?
Yes. Closed-day or out-of-hours fitting can be arranged.
How long does a package take in Greenford?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Can the shutter box be hidden?
Usually, yes. When the frontage is new we can build the box in behind the fascia and leave an access panel for servicing. Head height above the door decides how much room there is.
Where else do we fit shopfront and shutter packages near Greenford?
What else can we do in Greenford?
Find out what your frontage will cost in Greenford
Answer four quick questions for a guide price, or book a free survey for a firm one.