Shopfront and shutter packages in Newry
If your shop in Newry needs a new front and a shutter, we can do both as one job, from £3,895 plus VAT, after a free site survey.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What can you expect in Newry?
A job starts the same way wherever you are: a measured survey, a look at the lintel and floor level, and a conversation about how the unit trades. We cover postcodes including BT35 and BT34, and we also work nearby in Banbridge and Armagh.
How much will it cost?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you check before you decide?
How does a joint install save trading time?
The frontage and shutter go in as one sequence, so you close once. With two contractors, you close twice and hope they agree on who damaged what.
Why plan the frontage and shutter together?
Because the shutter box needs a home. Plan it with the fascia and it disappears. Add it later and it usually ends up on the face of the building.
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
Do you need consent in Newry?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so Newry, Mourne and Down District Council will normally expect a planning application. In Northern Ireland, councils decide planning applications, and Building Control applications are separate. Listed buildings need listed building consent.
What do people ask about shopfront and shutter packages in Newry?
Do you cover Newry for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Newry.
How long does a package take in Newry?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Who decides planning for a frontage in Newry?
Newry, Mourne and Down District Council is the planning authority. We tell you at survey what is likely to need consent.
How long will my shop be closed?
That depends on the job, and your quotation sets out the fitting days. We plan the work around trading hours and can arrange closed-day or out-of-hours fitting.
Where else do we fit shopfront and shutter packages near Newry?
What else can we do in Newry?