Shopfront and shutter packages in Larne
We fit shopfront and shutter packages in Larne from £3,895 plus VAT. You get a free site survey, an itemised quotation and one contract for both parts.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

How does it work in Larne?
A frontage in Larne has to suit the street as well as the shop. Mid and East Antrim Borough Council decides what is acceptable where planning applies, so we draw with that in mind.
What are the guide prices?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What is worth knowing?
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
Will the colours really match?
Frame and shutter are powder coated to the same RAL reference. Coating on different materials can vary slightly, which we will show you on samples first.
What decides the final package price?
Width, height, frame material, curtain type, and whether the box can be hidden. Access and strip-out are the other two things that move the price.
Do you need consent in Larne?
An external shutter normally needs planning permission from Mid and East Antrim Borough Council. An internal shutter or grille often does not, so it is worth checking before you order. In Northern Ireland, councils decide planning applications, and Building Control applications are separate. Listed buildings need listed building consent.
What do people ask about shopfront and shutter packages in Larne?
Who decides planning for a frontage in Larne?
Mid and East Antrim Borough Council is the planning authority. We tell you at survey what is likely to need consent.
How long does a package take in Larne?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Do you cover Larne for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Larne.
Do I need planning permission for a package?
Often, yes. A changed frontage or an external shutter usually needs consent from your council. We can advise what to check at survey.
Where else do we fit shopfront and shutter packages near Larne?
What else can we do in Larne?
Find out what your frontage will cost in Larne
Answer four quick questions for a guide price, or book a free survey for a firm one.