Shopfront and shutter packages in Dundonald
We fit shopfront and shutter packages in Dundonald from £3,895 plus VAT. You get a free site survey, an itemised quotation and one contract for both parts.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What happens in Dundonald?
We aim to fit the survey around your opening hours in Dundonald, and we also cover Holywood and Comber. You get the same written quotation wherever the shop is.
What are the guide prices?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What is worth knowing?
What does one drawing change?
Everything lines up: door head, guide channels, fascia, sign fixing and power supply. It also gives your council or landlord one clear document to look at.
Is the box accessible for servicing?
It has to be. We build in a removable panel so that an engineer can reach the motor, brake and spring parts.
Why plan the frontage and shutter together?
Because the shutter box needs a home. Plan it with the fascia and it disappears. Add it later and it usually ends up on the face of the building.
Will this need planning permission in Dundonald?
An external shutter normally needs planning permission from Lisburn and Castlereagh City Council. An internal shutter or grille often does not, so it is worth checking before you order. In Northern Ireland, councils decide planning applications, and Building Control applications are separate. Listed buildings need listed building consent.
What do people ask about shopfront and shutter packages in Dundonald?
Who decides planning for a frontage in Dundonald?
Lisburn and Castlereagh City Council is the planning authority. We tell you at survey what is likely to need consent.
Do you cover Dundonald for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Dundonald.
How long does a package take in Dundonald?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
How long will my shop be closed?
That depends on the job, and your quotation sets out the fitting days. We plan the work around trading hours and can arrange closed-day or out-of-hours fitting.
Where else do we fit shopfront and shutter packages near Dundonald?
What else can we do in Dundonald?
Find out what your frontage will cost in Dundonald
Answer four quick questions for a guide price, or book a free survey for a firm one.