Shopfront and shutter packages in Kettering
One drawing, one price and one fitting team: that is how we handle shopfront and shutter packages in Kettering. Guide prices start at £3,895 plus VAT.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What can you expect in Kettering?
We aim to fit the survey around your opening hours in Kettering, and we also cover Wellingborough and Corby. You get the same written quotation wherever the shop is.
What should you budget?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you think about first?
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
Why plan the frontage and shutter together?
Because the shutter box needs a home. Plan it with the fascia and it disappears. Add it later and it usually ends up on the face of the building.
What decides the final package price?
Width, height, frame material, curtain type, and whether the box can be hidden. Access and strip-out are the other two things that move the price.
Do you need consent in Kettering?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so North Northamptonshire Council will normally expect a planning application. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Kettering?
Can you fit a package around my trading hours in Kettering?
Yes. Closed-day or out-of-hours fitting can be arranged.
Do you cover Kettering for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Kettering.
How long does a package take in Kettering?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Can the shutter box be hidden?
Usually, yes. When the frontage is new we can build the box in behind the fascia and leave an access panel for servicing. Head height above the door decides how much room there is.
Where else do we fit shopfront and shutter packages near Kettering?
What else can we do in Kettering?
Find out what your frontage will cost in Kettering
Answer four quick questions for a guide price, or book a free survey for a firm one.