Shopfront and shutter packages in Hyde
One drawing, one price and one fitting team: that is how we handle shopfront and shutter packages in Hyde. Guide prices start at £3,895 plus VAT.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What happens in Hyde?
A job starts the same way wherever you are: a measured survey, a look at the lintel and floor level, and a conversation about how the unit trades. We cover postcodes including SK14, and we also work nearby in Denton and Dukinfield.
What should you check before you decide?
Why plan the frontage and shutter together?
Because the shutter box needs a home. Plan it with the fascia and it disappears. Add it later and it usually ends up on the face of the building.
Should I choose solid or perforated?
Solid gives more privacy and strength. Perforated keeps the window working at night. On the outside of a shop, some councils resist both, so check before you choose.
Will the colours really match?
Frame and shutter are powder coated to the same RAL reference. Coating on different materials can vary slightly, which we will show you on samples first.
What are the guide prices?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Will this need planning permission in Hyde?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so Tameside Metropolitan Borough Council will normally expect a planning application. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Hyde?
Who decides planning for a frontage in Hyde?
Tameside Metropolitan Borough Council is the planning authority. We tell you at survey what is likely to need consent.
How long does a package take in Hyde?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Do you cover Hyde for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Hyde.
Can the shutter box be hidden?
Usually, yes. When the frontage is new we can build the box in behind the fascia and leave an access panel for servicing. Head height above the door decides how much room there is.
Where else do we fit shopfront and shutter packages near Hyde?
What else can we do in Hyde?
Find out what your frontage will cost in Hyde
Answer four quick questions for a guide price, or book a free survey for a firm one.