Steel shopfronts in Hyde
Need a steel shopfront in Hyde? We draw it from a free site survey, make it to your opening and fit it around your trading hours. Guide prices start at £3,600 plus VAT.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

How does it work in Hyde?
Our surveys in Hyde cover postcodes including SK14, along with Denton and Dukinfield. Planning applications here go to Tameside Metropolitan Borough Council, so it is worth reading any shopfront guidance it publishes before anything is drawn.
What makes the difference?
Should the stallriser stay?
A stallriser protects the bottom of the glass from kicks, trolleys and cleaning water. On older streets it is also part of the look.
What about the fascia and sign?
We set out the fascia at the same time, so your sign fixings and any shutter box do not clash. Illuminated signs can need advertisement consent, depending on size, position and area.
What does the written quotation show?
Every item: frame, glass, doors, stallriser, strip-out and any electrics. It stays valid for 90 days, and nothing is ordered until you accept.
What are the guide prices?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Will this need planning permission in Hyde?
Usually yes, if the look of the frontage changes. Replacing like for like may not need permission, but Tameside Metropolitan Borough Council has the final say. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Hyde?
Does a new shopfront in Hyde need planning permission?
A change to how the frontage looks usually does. Tameside Metropolitan Borough Council is the council to check with, and we advise at survey.
How soon can you fit a steel shopfront in Hyde?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
Is steel stronger than aluminium for a shopfront?
Yes, section for section. It also lets you keep glazing bars slim while holding heavier glass.
Where else do we fit steel shopfronts near Hyde?
What else can we do in Hyde?
Find out what your frontage will cost in Hyde
Answer four quick questions for a guide price, or book a free survey for a firm one.