Shopfront and shutter packages in Fareham
If your shop in Fareham needs a new front and a shutter, we can do both as one job, from £3,895 plus VAT, after a free site survey.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What can you expect in Fareham?
Fareham sits in Hampshire, and Fareham Borough Council is the planning authority. For most shops that means checking consent before the order is placed, not after it.
What should you think about first?
What does one drawing change?
Everything lines up: door head, guide channels, fascia, sign fixing and power supply. It also gives your council or landlord one clear document to look at.
Why plan the frontage and shutter together?
Because the shutter box needs a home. Plan it with the fascia and it disappears. Add it later and it usually ends up on the face of the building.
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
How much will it cost?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent in Fareham?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so Fareham Borough Council will normally expect a planning application. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Fareham?
Do you cover Fareham for both the shopfront and shutter?
Yes. One surveyor and one fitting team handle both parts in Fareham.
Can you fit a package around my trading hours in Fareham?
Yes. Closed-day or out-of-hours fitting can be arranged.
How long does a package take in Fareham?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Can the shutter box be hidden?
Usually, yes. When the frontage is new we can build the box in behind the fascia and leave an access panel for servicing. Head height above the door decides how much room there is.
Where else do we fit shopfront and shutter packages near Fareham?
What else can we do in Fareham?
Find out what your frontage will cost in Fareham
Answer four quick questions for a guide price, or book a free survey for a firm one.