Shopfront and shutter packages in Bromborough
We fit shopfront and shutter packages in Bromborough from £3,895 plus VAT. You get a free site survey, an itemised quotation and one contract for both parts.
- Guide price, plus VAT
- £3,895 to £15,995
- Lead time
- 3 to 6 weeks after drawing sign-off for aluminium and steel

What happens in Bromborough?
A job starts the same way wherever you are: a measured survey, a look at the lintel and floor level, and a conversation about how the unit trades. We cover postcodes including CH62, and we also work nearby in Bebington and Birkenhead.
What are the guide prices?
| Package | Up to 3 m wide | 5 to 6 m wide |
|---|---|---|
| Security package | £5,095 to £7,995 | £10,095 to £15,995 |
| Display package | £4,195 to £6,295 | £7,995 to £12,295 |
| Essential package | £3,895 to £5,995 | £7,695 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you think about first?
What does one drawing change?
Everything lines up: door head, guide channels, fascia, sign fixing and power supply. It also gives your council or landlord one clear document to look at.
Can I phase the work?
Yes. If cash flow is tight, we can fit the frontage first and leave the box, guides and power ready for the shutter later.
What happens to my old frontage?
If the job is a replacement, removal and disposal are priced on the quotation, and we aim to leave the unit secure or boarded overnight.
Do you need consent in Bromborough?
An external shutter normally needs planning permission from Wirral Borough Council. An internal shutter or grille often does not, so it is worth checking before you order. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about shopfront and shutter packages in Bromborough?
Who decides planning for a frontage in Bromborough?
Wirral Borough Council is the planning authority. We tell you at survey what is likely to need consent.
How long does a package take in Bromborough?
For aluminium and steel frontages, usually 3 to 6 weeks from drawing sign-off. Other materials are confirmed on your quotation.
Can you fit a package around my trading hours in Bromborough?
Yes. Closed-day or out-of-hours fitting can be arranged.
How long will my shop be closed?
That depends on the job, and your quotation sets out the fitting days. We plan the work around trading hours and can arrange closed-day or out-of-hours fitting.
Where else do we fit shopfront and shutter packages near Bromborough?
What else can we do in Bromborough?
Find out what your frontage will cost in Bromborough
Answer four quick questions for a guide price, or book a free survey for a firm one.