Insulated roller shutters across County Armagh
Shopfronts and Shutters UK fits insulated roller shutters across County Armagh, from £1,850 plus VAT, on a new frontage or the one you already have.
- Guide price, plus VAT
- £1,850 to £4,595
- Lead time
- 2 to 3 weeks after survey

What can you expect across County Armagh?
From city-centre units to village parades, the job starts the same way. Craigavon, Portadown, Lurgan and Armagh are among the places we cover. Armagh City, Banbridge and Craigavon Borough Council is the council to check with here. Georgian streets in Armagh sit alongside the busy retail and industrial towns of Portadown and Lurgan.
What makes the difference?
Does a shutter need planning permission?
An external shutter usually does. Many councils resist solid external shutters, and some resist perforated ones too. An internal grille or shutter is usually the safer route, so we can advise what to check before you order.
What electrics are needed?
A power supply near the box, installed by a qualified electrician. We show the position on the drawing.
What about a fire exit?
A shutter must never trap people in. If it covers an escape route, it needs to be open while the premises are occupied, or opened easily from inside.
How much will it cost?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £1,850 to £2,495 |
| 3 to 4 m | A wider single unit | £2,395 to £3,095 |
| 4 to 5 m | A double-fronted or corner unit | £2,895 to £3,695 |
| 5 to 6 m | A large double unit | £3,395 to £4,595 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent across County Armagh?
Usually yes, if the shutter goes on the outside. External shutters change how the building looks, so your council will normally expect a planning application. In Northern Ireland, councils decide planning applications, and Building Control applications are separate. Listed buildings need listed building consent.
What do people ask about insulated roller shutters across County Armagh?
How soon can you fit an insulated roller shutter across County Armagh?
Lead time is 2 to 3 weeks after survey. We agree the fitting day with you.
Do I need planning permission for a shutter across County Armagh?
An external shutter usually needs it, and your council decides. Many councils resist solid external shutters, and some resist perforated ones too.
Can you match the shutter to my shopfront?
Yes. We powder coat to a RAL colour to match your frame as closely as we can.
Are insulated shutters quieter?
Yes. Foam-filled laths rattle less, which is useful under flats.
Which towns do we cover in County Armagh?
Find out what your frontage will cost across County Armagh
Answer four quick questions for a guide price, or book a free survey for a firm one.