Steel shopfronts across Worcestershire
Our steel shopfronts across Worcestershire come with a free site survey, an itemised written quotation and a guide price from £3,600 plus VAT.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What can you expect across Worcestershire?
From city-centre units to village parades, the job starts the same way. Worcester, Redditch, Kidderminster and Malvern are among the places we cover. Councils here include Worcester, Wyre Forest and Wychavon. Worcester, Redditch and Kidderminster are the main centres, with Malvern, Evesham and Droitwich among the older towns.
What should you budget?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What makes the difference?
What about the fascia and sign?
We set out the fascia at the same time, so your sign fixings and any shutter box do not clash. Illuminated signs can need advertisement consent, depending on size, position and area.
How do you deal with the threshold?
We aim for level or near-level access. New doors need thought about wheelchair and pushchair users, and we check the floor before we promise anything.
What does the written quotation show?
Every item: frame, glass, doors, stallriser, strip-out and any electrics. It stays valid for 90 days, and nothing is ordered until you accept.
Will this need planning permission across Worcestershire?
It depends on how much changes. A new layout, new materials or a moved door usually needs permission from your council. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts across Worcestershire?
Does a new shopfront across Worcestershire need planning permission?
A change to how the frontage looks usually does. Your council is the council to check with, and we advise at survey.
How soon can you fit a steel shopfront across Worcestershire?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
Does steel rust?
Not if the finish is right and stays intact. It is galvanised or primed, then powder coated.
Which towns do we cover in Worcestershire?
Find out what your frontage will cost across Worcestershire
Answer four quick questions for a guide price, or book a free survey for a firm one.