Steel shopfronts in Winchester
We survey, make and fit steel shopfronts in Winchester, starting with a free site survey. Guide prices start from £3,600 plus VAT.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

How does it work in Winchester?
Working in Winchester means working with Winchester City Council on planning, and sometimes with a landlord on the lease. We flag both early, so that neither one holds up your opening date.
What is worth knowing?
Should the stallriser stay?
A stallriser protects the bottom of the glass from kicks, trolleys and cleaning water. On older streets it is also part of the look.
Can it have a shutter later?
Yes, but it is far neater to allow for one now. Tell us at survey, and we will leave height behind the fascia even if the shutter comes later.
What does the written quotation show?
Every item: frame, glass, doors, stallriser, strip-out and any electrics. It stays valid for 90 days, and nothing is ordered until you accept.
How much will it cost?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Will this need planning permission in Winchester?
It depends on how much changes. A new layout, new materials or a moved door usually needs permission from Winchester City Council. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Winchester?
How much does a steel shopfront cost in Winchester?
Guide prices start from £3,600 plus VAT. Size, doors and glass set the final figure after a free site survey.
How soon can you fit a steel shopfront in Winchester?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
Do you cover the postcodes around Winchester?
Yes, including SO23, SO21 and SO22.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Winchester?
What else can we do in Winchester?
Find out what your frontage will cost in Winchester
Answer four quick questions for a guide price, or book a free survey for a firm one.