Steel shopfronts in Trowbridge
Steel shopfronts in Trowbridge start from £3,600 plus VAT. Each is made to the measured opening, after a free site survey.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What happens in Trowbridge?
Our surveys in Trowbridge cover postcodes including BA14 and BA15, along with Westbury and Melksham. Planning applications here go to Wiltshire Council, so it is worth reading any shopfront guidance it publishes before anything is drawn.
What should you budget?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What makes the difference?
Which glass should go in?
Safety glass is needed in doors, side panels and low-level panes. Laminated glass is worth the extra if the street has a history of break-ins.
What affects the price most?
Width, the number of doors, glass type and any strip-out. A second door or a laminated upgrade moves the figure more than the colour does.
How do you deal with the threshold?
We aim for level or near-level access. New doors need thought about wheelchair and pushchair users, and we check the floor before we promise anything.
Will this need planning permission in Trowbridge?
A like-for-like replacement often does not need permission, but a visibly different frontage usually does. The application goes to Wiltshire Council. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Trowbridge?
How soon can you fit a steel shopfront in Trowbridge?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
Do you cover the postcodes around Trowbridge?
Yes, including BA14 and BA15.
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Trowbridge?
What else can we do in Trowbridge?
Find out what your frontage will cost in Trowbridge
Answer four quick questions for a guide price, or book a free survey for a firm one.