0800 088 6248Get a guide price

Steel shopfronts in Stoke Newington

Need a steel shopfront in Stoke Newington? We draw it from a free site survey, make it to your opening and fit it around your trading hours. Guide prices start at £3,600 plus VAT.

Guide price, plus VAT
£3,600 to £11,995
Lead time
5 to 6 weeks after drawing sign-off
Dark grey steel shopfront with slim glazing bars on a brick building

What happens in Stoke Newington?

Our surveys in Stoke Newington cover postcodes including N16, along with Dalston and Hackney. Planning applications here go to London Borough of Hackney, so it is worth reading any shopfront guidance it publishes before anything is drawn.

What should you think about first?

Which colours work best?

Dark greys and black are the most requested because they frame the shop well. In a conservation area, ask us first, as colour can matter to the council.

Can it have a shutter later?

Yes, but it is far neater to allow for one now. Tell us at survey, and we will leave height behind the fascia even if the shutter comes later.

What about the fascia and sign?

We set out the fascia at the same time, so your sign fixings and any shutter box do not clash. Illuminated signs can need advertisement consent, depending on size, position and area.

What are the guide prices?

Guide prices by opening width
Opening widthTypical unitGuide price plus VAT
Up to 3 mA typical single shop unit£3,600 to £5,995
3 to 4 mA wider single unit£4,695 to £7,795
4 to 5 mA double-fronted or corner unit£5,895 to £9,695
5 to 6 mA large double unit£7,195 to £11,995

Guide prices, not offers. Your written quotation sets the final figure.

Will this need planning permission in Stoke Newington?

Usually yes, if the look of the frontage changes. Replacing like for like may not need permission, but London Borough of Hackney has the final say. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.

What do people ask about steel shopfronts in Stoke Newington?

Can you add a shutter to the new shopfront?

Yes, and it is best planned now. We can price the frontage and shutter as one job.

How soon can you fit a steel shopfront in Stoke Newington?

Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.

Does a new shopfront in Stoke Newington need planning permission?

A change to how the frontage looks usually does. London Borough of Hackney is the council to check with, and we advise at survey.

Does steel rust?

Not if the finish is right and stays intact. It is galvanised or primed, then powder coated.

Get your free survey booked

Enter the postcode of the shop.

Enter your name.

Enter a UK phone number.

Enter a valid email address.

Tick to confirm you have read the notice.

Surveys for new work are free. Repairs and servicing are charged. Nothing is ordered until you accept the quotation.

Find out what your frontage will cost in Stoke Newington

Answer four quick questions for a guide price, or book a free survey for a firm one.

WhatsApp
CallWhatsAppGuide price

We use optional cookies for analytics and live chat. They stay off unless you accept. Cookie policy

Live chat uses Tawk.to and sets cookies. Cookie policy