Steel shopfronts in Sidmouth
We survey, make and fit steel shopfronts in Sidmouth, starting with a free site survey. Guide prices start from £3,600 plus VAT.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What happens in Sidmouth?
We cover Sidmouth and postcodes including EX10, EX11 and EX12, and teams working here can also reach Honiton and Exmouth. Parking, deliveries and pavement space all go into the plan for fitting day.
What is worth knowing?
How do you deal with the threshold?
We aim for level or near-level access. New doors need thought about wheelchair and pushchair users, and we check the floor before we promise anything.
What does the written quotation show?
Every item: frame, glass, doors, stallriser, strip-out and any electrics. It stays valid for 90 days, and nothing is ordered until you accept.
What about the fascia and sign?
We set out the fascia at the same time, so your sign fixings and any shutter box do not clash. Illuminated signs can need advertisement consent, depending on size, position and area.
What are the guide prices?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent in Sidmouth?
Usually yes, if the look of the frontage changes. Replacing like for like may not need permission, but East Devon District Council has the final say. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Sidmouth?
Do you cover the postcodes around Sidmouth?
Yes, including EX10, EX11 and EX12.
How soon can you fit a steel shopfront in Sidmouth?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Sidmouth?
What else can we do in Sidmouth?
Find out what your frontage will cost in Sidmouth
Answer four quick questions for a guide price, or book a free survey for a firm one.