Steel shopfronts in Renfrew
Steel shopfronts in Renfrew start from £3,600 plus VAT. Each is made to the measured opening, after a free site survey.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

How does it work in Renfrew?
A frontage in Renfrew has to suit the street as well as the shop. Renfrewshire Council decides what is acceptable where planning applies, so we draw with that in mind.
What is worth knowing?
How do you deal with the threshold?
We aim for level or near-level access. New doors need thought about wheelchair and pushchair users, and we check the floor before we promise anything.
What affects the price most?
Width, the number of doors, glass type and any strip-out. A second door or a laminated upgrade moves the figure more than the colour does.
What does the written quotation show?
Every item: frame, glass, doors, stallriser, strip-out and any electrics. It stays valid for 90 days, and nothing is ordered until you accept.
How much will it cost?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Will this need planning permission in Renfrew?
It depends on how much changes. A new layout, new materials or a moved door usually needs permission from Renfrewshire Council. In Scotland, work can also need a building warrant before it starts, and listed buildings need listed building consent from the council.
What do people ask about steel shopfronts in Renfrew?
How soon can you fit a steel shopfront in Renfrew?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
Does a new shopfront in Renfrew need planning permission?
A change to how the frontage looks usually does. Renfrewshire Council is the council to check with, and we advise at survey.
Do you cover the postcodes around Renfrew?
Yes, including PA4.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Renfrew?
What else can we do in Renfrew?
Find out what your frontage will cost in Renfrew
Answer four quick questions for a guide price, or book a free survey for a firm one.