Steel shopfronts in Redcar
Need a steel shopfront in Redcar? We draw it from a free site survey, make it to your opening and fit it around your trading hours. Guide prices start at £3,600 plus VAT.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What happens in Redcar?
We aim to fit the survey around your opening hours in Redcar, and we also cover Guisborough and Middlesbrough. You get the same written quotation wherever the shop is.
What should you check before you decide?
How is the frontage measured?
We measure the structural opening, not the old frame. Lintel condition, floor level and how square the opening is all get recorded at survey.
What about the fascia and sign?
We set out the fascia at the same time, so your sign fixings and any shutter box do not clash. Illuminated signs can need advertisement consent, depending on size, position and area.
Which glass should go in?
Safety glass is needed in doors, side panels and low-level panes. Laminated glass is worth the extra if the street has a history of break-ins.
What are the guide prices?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Will this need planning permission in Redcar?
Usually yes, if the look of the frontage changes. Replacing like for like may not need permission, but Redcar and Cleveland Borough Council has the final say. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Redcar?
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
How soon can you fit a steel shopfront in Redcar?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
Does a new shopfront in Redcar need planning permission?
A change to how the frontage looks usually does. Redcar and Cleveland Borough Council is the council to check with, and we advise at survey.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Redcar?
What else can we do in Redcar?
Find out what your frontage will cost in Redcar
Answer four quick questions for a guide price, or book a free survey for a firm one.