Steel shopfronts across Powys
Our steel shopfronts across Powys come with a free site survey, an itemised written quotation and a guide price from £3,600 plus VAT.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What happens across Powys?
In Powys, the usual route is the same wherever you are: a measured survey, an itemised quotation, then fitting at a time that suits the shop. Towns we cover include Newtown, Brecon, Welshpool and Llandrindod Wells. Newtown, Brecon and Welshpool are small market centres serving a very large rural county.
What should you budget?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you check before you decide?
What about the fascia and sign?
We set out the fascia at the same time, so your sign fixings and any shutter box do not clash. Illuminated signs can need advertisement consent, depending on size, position and area.
What affects the price most?
Width, the number of doors, glass type and any strip-out. A second door or a laminated upgrade moves the figure more than the colour does.
Can I keep trading during the work?
Often, in part. Fitting days can be planned for your quiet days, and closed-day or out-of-hours work can be arranged.
Will this need planning permission across Powys?
Usually yes, if the look of the frontage changes. Replacing like for like may not need permission, but your council has the final say. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent, and rules are set by the Welsh Government.
What do people ask about steel shopfronts across Powys?
Does a new shopfront across Powys need planning permission?
A change to how the frontage looks usually does. Your council is the council to check with, and we advise at survey.
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
How soon can you fit a steel shopfront across Powys?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Which towns do we cover in Powys?
Find out what your frontage will cost across Powys
Answer four quick questions for a guide price, or book a free survey for a firm one.