Steel shopfronts in Peacehaven
Shopfronts and Shutters UK fits steel shopfronts in Peacehaven, from £3,600 plus VAT, with a shutter planned in from the start if you want one.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

How does it work in Peacehaven?
Peacehaven sits in East Sussex, and Lewes District Council is the planning authority. For most shops that means checking consent before the order is placed, not after it.
How much will it cost?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you check before you decide?
How is the frontage measured?
We measure the structural opening, not the old frame. Lintel condition, floor level and how square the opening is all get recorded at survey.
Can it have a shutter later?
Yes, but it is far neater to allow for one now. Tell us at survey, and we will leave height behind the fascia even if the shutter comes later.
How do you deal with the threshold?
We aim for level or near-level access. New doors need thought about wheelchair and pushchair users, and we check the floor before we promise anything.
Do you need consent in Peacehaven?
Usually yes, if the look of the frontage changes. Replacing like for like may not need permission, but Lewes District Council has the final say. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Peacehaven?
Do you cover the postcodes around Peacehaven?
Yes, including BN10.
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
How soon can you fit a steel shopfront in Peacehaven?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Peacehaven?
What else can we do in Peacehaven?
Find out what your frontage will cost in Peacehaven
Answer four quick questions for a guide price, or book a free survey for a firm one.