Steel shopfronts in Palmers Green
Our steel shopfronts in Palmers Green come with a free site survey, an itemised written quotation and a guide price from £3,600 plus VAT.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What happens in Palmers Green?
Palmers Green sits in Greater London, and London Borough of Enfield is the planning authority. For most shops that means checking consent before the order is placed, not after it.
What should you check before you decide?
How do you deal with the threshold?
We aim for level or near-level access. New doors need thought about wheelchair and pushchair users, and we check the floor before we promise anything.
Can it have a shutter later?
Yes, but it is far neater to allow for one now. Tell us at survey, and we will leave height behind the fascia even if the shutter comes later.
Which glass should go in?
Safety glass is needed in doors, side panels and low-level panes. Laminated glass is worth the extra if the street has a history of break-ins.
What should you budget?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent in Palmers Green?
Usually yes, if the look of the frontage changes. Replacing like for like may not need permission, but London Borough of Enfield has the final say. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Palmers Green?
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
How much does a steel shopfront cost in Palmers Green?
Guide prices start from £3,600 plus VAT. Size, doors and glass set the final figure after a free site survey.
Does a new shopfront in Palmers Green need planning permission?
A change to how the frontage looks usually does. London Borough of Enfield is the council to check with, and we advise at survey.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Palmers Green?
What else can we do in Palmers Green?
Find out what your frontage will cost in Palmers Green
Answer four quick questions for a guide price, or book a free survey for a firm one.