Steel shopfronts in Oxted
Steel shopfronts in Oxted start from £3,600 plus VAT. Each is made to the measured opening, after a free site survey.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What can you expect in Oxted?
Local rules matter more than people expect. Tandridge District Council handles planning for Oxted, and its view of external shutters and frontage changes shapes what we recommend.
How much will it cost?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What is worth knowing?
Should the stallriser stay?
A stallriser protects the bottom of the glass from kicks, trolleys and cleaning water. On older streets it is also part of the look.
What does the written quotation show?
Every item: frame, glass, doors, stallriser, strip-out and any electrics. It stays valid for 90 days, and nothing is ordered until you accept.
How is the frontage measured?
We measure the structural opening, not the old frame. Lintel condition, floor level and how square the opening is all get recorded at survey.
Will this need planning permission in Oxted?
Usually yes, if the look of the frontage changes. Replacing like for like may not need permission, but Tandridge District Council has the final say. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Oxted?
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
How much does a steel shopfront cost in Oxted?
Guide prices start from £3,600 plus VAT. Size, doors and glass set the final figure after a free site survey.
Does a new shopfront in Oxted need planning permission?
A change to how the frontage looks usually does. Tandridge District Council is the council to check with, and we advise at survey.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Oxted?
What else can we do in Oxted?
Find out what your frontage will cost in Oxted
Answer four quick questions for a guide price, or book a free survey for a firm one.