Steel shopfronts in New Milton
Shopfronts and Shutters UK fits steel shopfronts in New Milton, from £3,600 plus VAT, with a shutter planned in from the start if you want one.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What happens in New Milton?
We aim to fit the survey around your opening hours in New Milton, and we also cover Christchurch and Lymington. You get the same written quotation wherever the shop is.
What should you check before you decide?
What does the written quotation show?
Every item: frame, glass, doors, stallriser, strip-out and any electrics. It stays valid for 90 days, and nothing is ordered until you accept.
Can I keep trading during the work?
Often, in part. Fitting days can be planned for your quiet days, and closed-day or out-of-hours work can be arranged.
Can it have a shutter later?
Yes, but it is far neater to allow for one now. Tell us at survey, and we will leave height behind the fascia even if the shutter comes later.
What should you budget?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Will this need planning permission in New Milton?
It depends on how much changes. A new layout, new materials or a moved door usually needs permission from New Forest District Council. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in New Milton?
Does a new shopfront in New Milton need planning permission?
A change to how the frontage looks usually does. New Forest District Council is the council to check with, and we advise at survey.
How soon can you fit a steel shopfront in New Milton?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
Do you cover the postcodes around New Milton?
Yes, including BH25.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near New Milton?
What else can we do in New Milton?
Find out what your frontage will cost in New Milton
Answer four quick questions for a guide price, or book a free survey for a firm one.