Steel shopfronts across Merseyside
Steel shopfronts across Merseyside start from £3,600 plus VAT. Each is made to the measured opening, after a free site survey.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What can you expect across Merseyside?
We work right across Merseyside, including Liverpool, Birkenhead, St Helens and Southport. Rules on frontages and shutters differ from one council to the next. Councils here include Liverpool, Wirral and Sefton. Bold Street and the Liverpool city centre sit alongside town centres in Birkenhead, Southport and St Helens.
How much will it cost?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What makes the difference?
Should the stallriser stay?
A stallriser protects the bottom of the glass from kicks, trolleys and cleaning water. On older streets it is also part of the look.
What does the written quotation show?
Every item: frame, glass, doors, stallriser, strip-out and any electrics. It stays valid for 90 days, and nothing is ordered until you accept.
How do you deal with the threshold?
We aim for level or near-level access. New doors need thought about wheelchair and pushchair users, and we check the floor before we promise anything.
Will this need planning permission across Merseyside?
Usually yes, if the look of the frontage changes. Replacing like for like may not need permission, but your council has the final say. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts across Merseyside?
Does a new shopfront across Merseyside need planning permission?
A change to how the frontage looks usually does. Your council is the council to check with, and we advise at survey.
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
How soon can you fit a steel shopfront across Merseyside?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
Does steel rust?
Not if the finish is right and stays intact. It is galvanised or primed, then powder coated.
Find out what your frontage will cost across Merseyside
Answer four quick questions for a guide price, or book a free survey for a firm one.