Steel shopfronts in Maldon
Our steel shopfronts in Maldon come with a free site survey, an itemised written quotation and a guide price from £3,600 plus VAT.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

How does it work in Maldon?
A job starts the same way wherever you are: a measured survey, a look at the lintel and floor level, and a conversation about how the unit trades. We cover postcodes including CM9 and CM3, and we also work nearby in Witham and Chelmsford.
What should you think about first?
Can it have a shutter later?
Yes, but it is far neater to allow for one now. Tell us at survey, and we will leave height behind the fascia even if the shutter comes later.
How is the frontage measured?
We measure the structural opening, not the old frame. Lintel condition, floor level and how square the opening is all get recorded at survey.
How do you deal with the threshold?
We aim for level or near-level access. New doors need thought about wheelchair and pushchair users, and we check the floor before we promise anything.
How much will it cost?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent in Maldon?
A like-for-like replacement often does not need permission, but a visibly different frontage usually does. The application goes to Maldon District Council. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Maldon?
Does a new shopfront in Maldon need planning permission?
A change to how the frontage looks usually does. Maldon District Council is the council to check with, and we advise at survey.
Do you cover the postcodes around Maldon?
Yes, including CM9 and CM3.
How soon can you fit a steel shopfront in Maldon?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
Does steel rust?
Not if the finish is right and stays intact. It is galvanised or primed, then powder coated.
Where else do we fit steel shopfronts near Maldon?
What else can we do in Maldon?
Find out what your frontage will cost in Maldon
Answer four quick questions for a guide price, or book a free survey for a firm one.