Steel shopfronts in Kings Heath
Our steel shopfronts in Kings Heath come with a free site survey, an itemised written quotation and a guide price from £3,600 plus VAT.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

How does it work in Kings Heath?
Most shop owners come to us at one of three points: a new lease, a break-in, or a frontage that has finally given up. In each case the first step is a survey, and we cover postcodes including B14 and B47.
What are the guide prices?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What should you think about first?
Can I keep trading during the work?
Often, in part. Fitting days can be planned for your quiet days, and closed-day or out-of-hours work can be arranged.
Which glass should go in?
Safety glass is needed in doors, side panels and low-level panes. Laminated glass is worth the extra if the street has a history of break-ins.
How is the frontage measured?
We measure the structural opening, not the old frame. Lintel condition, floor level and how square the opening is all get recorded at survey.
Do you need consent in Kings Heath?
It depends on how much changes. A new layout, new materials or a moved door usually needs permission from Birmingham City Council. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Kings Heath?
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
Do you cover the postcodes around Kings Heath?
Yes, including B14 and B47.
Does a new shopfront in Kings Heath need planning permission?
A change to how the frontage looks usually does. Birmingham City Council is the council to check with, and we advise at survey.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Kings Heath?
What else can we do in Kings Heath?
Find out what your frontage will cost in Kings Heath
Answer four quick questions for a guide price, or book a free survey for a firm one.