Steel shopfronts in Herne Bay
Steel shopfronts in Herne Bay start from £3,600 plus VAT. Each is made to the measured opening, after a free site survey.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What happens in Herne Bay?
Most shop owners come to us at one of three points: a new lease, a break-in, or a frontage that has finally given up. In each case the first step is a survey, and we cover postcodes including CT6.
What is worth knowing?
Can it have a shutter later?
Yes, but it is far neater to allow for one now. Tell us at survey, and we will leave height behind the fascia even if the shutter comes later.
What does the written quotation show?
Every item: frame, glass, doors, stallriser, strip-out and any electrics. It stays valid for 90 days, and nothing is ordered until you accept.
What affects the price most?
Width, the number of doors, glass type and any strip-out. A second door or a laminated upgrade moves the figure more than the colour does.
How much will it cost?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent in Herne Bay?
It depends on how much changes. A new layout, new materials or a moved door usually needs permission from Canterbury City Council. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Herne Bay?
How soon can you fit a steel shopfront in Herne Bay?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
How much does a steel shopfront cost in Herne Bay?
Guide prices start from £3,600 plus VAT. Size, doors and glass set the final figure after a free site survey.
Do you cover the postcodes around Herne Bay?
Yes, including CT6.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Herne Bay?
What else can we do in Herne Bay?
Find out what your frontage will cost in Herne Bay
Answer four quick questions for a guide price, or book a free survey for a firm one.