Steel shopfronts in Haslemere
Shopfronts and Shutters UK fits steel shopfronts in Haslemere, from £3,600 plus VAT, with a shutter planned in from the start if you want one.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What happens in Haslemere?
We cover Haslemere and postcodes including GU27, GU26 and GU29, and teams working here can also reach Bordon and Godalming. Parking, deliveries and pavement space all go into the plan for fitting day.
What are the guide prices?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What makes the difference?
Should the stallriser stay?
A stallriser protects the bottom of the glass from kicks, trolleys and cleaning water. On older streets it is also part of the look.
What about the fascia and sign?
We set out the fascia at the same time, so your sign fixings and any shutter box do not clash. Illuminated signs can need advertisement consent, depending on size, position and area.
How do you deal with the threshold?
We aim for level or near-level access. New doors need thought about wheelchair and pushchair users, and we check the floor before we promise anything.
Will this need planning permission in Haslemere?
A like-for-like replacement often does not need permission, but a visibly different frontage usually does. The application goes to Waverley Borough Council. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Haslemere?
How soon can you fit a steel shopfront in Haslemere?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
Does a new shopfront in Haslemere need planning permission?
A change to how the frontage looks usually does. Waverley Borough Council is the council to check with, and we advise at survey.
Do you cover the postcodes around Haslemere?
Yes, including GU27, GU26 and GU29.
Does steel rust?
Not if the finish is right and stays intact. It is galvanised or primed, then powder coated.
Where else do we fit steel shopfronts near Haslemere?
What else can we do in Haslemere?
Find out what your frontage will cost in Haslemere
Answer four quick questions for a guide price, or book a free survey for a firm one.