Steel shopfronts in Harlow
Our steel shopfronts in Harlow come with a free site survey, an itemised written quotation and a guide price from £3,600 plus VAT.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

How does it work in Harlow?
Harlow sits in Essex, and Harlow District Council is the planning authority. For most shops that means checking consent before the order is placed, not after it.
What is worth knowing?
How is the frontage measured?
We measure the structural opening, not the old frame. Lintel condition, floor level and how square the opening is all get recorded at survey.
Which colours work best?
Dark greys and black are the most requested because they frame the shop well. In a conservation area, ask us first, as colour can matter to the council.
What affects the price most?
Width, the number of doors, glass type and any strip-out. A second door or a laminated upgrade moves the figure more than the colour does.
How much will it cost?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Will this need planning permission in Harlow?
Usually yes, if the look of the frontage changes. Replacing like for like may not need permission, but Harlow District Council has the final say. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Harlow?
How soon can you fit a steel shopfront in Harlow?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
How much does a steel shopfront cost in Harlow?
Guide prices start from £3,600 plus VAT. Size, doors and glass set the final figure after a free site survey.
Does a new shopfront in Harlow need planning permission?
A change to how the frontage looks usually does. Harlow District Council is the council to check with, and we advise at survey.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Harlow?
What else can we do in Harlow?
Find out what your frontage will cost in Harlow
Answer four quick questions for a guide price, or book a free survey for a firm one.