Steel shopfronts in Gateshead
Shopfronts and Shutters UK fits steel shopfronts in Gateshead, from £3,600 plus VAT, with a shutter planned in from the start if you want one.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What can you expect in Gateshead?
Working in Gateshead means working with Gateshead Metropolitan Borough Council on planning, and sometimes with a landlord on the lease. We flag both early, so that neither one holds up your opening date.
What is worth knowing?
How do you deal with the threshold?
We aim for level or near-level access. New doors need thought about wheelchair and pushchair users, and we check the floor before we promise anything.
What about the fascia and sign?
We set out the fascia at the same time, so your sign fixings and any shutter box do not clash. Illuminated signs can need advertisement consent, depending on size, position and area.
Can it have a shutter later?
Yes, but it is far neater to allow for one now. Tell us at survey, and we will leave height behind the fascia even if the shutter comes later.
What are the guide prices?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Do you need consent in Gateshead?
Usually yes, if the look of the frontage changes. Replacing like for like may not need permission, but Gateshead Metropolitan Borough Council has the final say. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Gateshead?
Do you cover the postcodes around Gateshead?
Yes, including NE8.
How soon can you fit a steel shopfront in Gateshead?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
Does a new shopfront in Gateshead need planning permission?
A change to how the frontage looks usually does. Gateshead Metropolitan Borough Council is the council to check with, and we advise at survey.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Gateshead?
What else can we do in Gateshead?
Find out what your frontage will cost in Gateshead
Answer four quick questions for a guide price, or book a free survey for a firm one.