Steel shopfronts in Folkestone
Need a steel shopfront in Folkestone? We draw it from a free site survey, make it to your opening and fit it around your trading hours. Guide prices start at £3,600 plus VAT.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

What can you expect in Folkestone?
A job starts the same way wherever you are: a measured survey, a look at the lintel and floor level, and a conversation about how the unit trades. We cover postcodes including CT20, CT19 and CT18, and we also work nearby in Hythe and Dover.
What are the guide prices?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
What makes the difference?
What affects the price most?
Width, the number of doors, glass type and any strip-out. A second door or a laminated upgrade moves the figure more than the colour does.
What does the written quotation show?
Every item: frame, glass, doors, stallriser, strip-out and any electrics. It stays valid for 90 days, and nothing is ordered until you accept.
Which colours work best?
Dark greys and black are the most requested because they frame the shop well. In a conservation area, ask us first, as colour can matter to the council.
Will this need planning permission in Folkestone?
It depends on how much changes. A new layout, new materials or a moved door usually needs permission from Folkestone and Hythe District Council. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Folkestone?
Does a new shopfront in Folkestone need planning permission?
A change to how the frontage looks usually does. Folkestone and Hythe District Council is the council to check with, and we advise at survey.
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
How soon can you fit a steel shopfront in Folkestone?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
Is steel stronger than aluminium for a shopfront?
Yes, section for section. It also lets you keep glazing bars slim while holding heavier glass.
Where else do we fit steel shopfronts near Folkestone?
What else can we do in Folkestone?
Find out what your frontage will cost in Folkestone
Answer four quick questions for a guide price, or book a free survey for a firm one.