Steel shopfronts in Esher
Steel shopfronts in Esher start from £3,600 plus VAT. Each is made to the measured opening, after a free site survey.
- Guide price, plus VAT
- £3,600 to £11,995
- Lead time
- 5 to 6 weeks after drawing sign-off

How does it work in Esher?
Working in Esher means working with Elmbridge Borough Council on planning, and sometimes with a landlord on the lease. We flag both early, so that neither one holds up your opening date.
What makes the difference?
How do you deal with the threshold?
We aim for level or near-level access. New doors need thought about wheelchair and pushchair users, and we check the floor before we promise anything.
Can it have a shutter later?
Yes, but it is far neater to allow for one now. Tell us at survey, and we will leave height behind the fascia even if the shutter comes later.
Can I keep trading during the work?
Often, in part. Fitting days can be planned for your quiet days, and closed-day or out-of-hours work can be arranged.
What should you budget?
| Opening width | Typical unit | Guide price plus VAT |
|---|---|---|
| Up to 3 m | A typical single shop unit | £3,600 to £5,995 |
| 3 to 4 m | A wider single unit | £4,695 to £7,795 |
| 4 to 5 m | A double-fronted or corner unit | £5,895 to £9,695 |
| 5 to 6 m | A large double unit | £7,195 to £11,995 |
Guide prices, not offers. Your written quotation sets the final figure.
Will this need planning permission in Esher?
It depends on how much changes. A new layout, new materials or a moved door usually needs permission from Elmbridge Borough Council. Illuminated signs can need advertisement consent, depending on size, position and area. Listed buildings need listed building consent as well.
What do people ask about steel shopfronts in Esher?
Can you add a shutter to the new shopfront?
Yes, and it is best planned now. We can price the frontage and shutter as one job.
Does a new shopfront in Esher need planning permission?
A change to how the frontage looks usually does. Elmbridge Borough Council is the council to check with, and we advise at survey.
How soon can you fit a steel shopfront in Esher?
Lead time is 5 to 6 weeks after drawing sign-off. We book the fitting days around your trading.
How long does a steel shopfront take?
Usually 5 to 6 weeks after drawing sign-off.
Where else do we fit steel shopfronts near Esher?
What else can we do in Esher?
Find out what your frontage will cost in Esher
Answer four quick questions for a guide price, or book a free survey for a firm one.